10thingsihateaboutyou
Member
- Joined
- Mar 28, 2025
- Messages
- 10
So, I'm a lessor and I have a 3-bedroom apartment that I rent out because I need extra income. I'm old and divorced so I need to support my children and old wife, we have remained friends after all. Anyway enough with the storyline you might figure out who I am. So, after the Electrical Installation Condition Report, I got all C1 C2 C3 problems. Attached is what it means. I'm scared that I would spend so much on replacement of the fuse box and the engineer who my friend referred to me really did not give me options. I want to ensure that I can fully comply without full fuse box replacement. Some of theproblems I have:
- Loose electrical box above the fuse box
- Door contractor switch may need to be removed
What to do/other options? Can combine 2 ring citcuits or not? Then do radial circuit isolation or grouping into B20? Or are these system compliant?
- Loose electrical box above the fuse box
- Door contractor switch may need to be removed
What to do/other options? Can combine 2 ring citcuits or not? Then do radial circuit isolation or grouping into B20? Or are these system compliant?