I have a question about simplifying our installs. so, we've got several different 480V, 3phase loads, and instead of running individual conduits for each one, we're thinking of running all the load conductors (all three sets of 3phase power conductors) in one big conduit.
Does the National Electrical Code NEC allow running multiple separate 480V 3phase feeders in a single conduit? What NEC articles cover this? We're trying to save on materials and labor, so any insight on the rules here would be huge!
Does the National Electrical Code NEC allow running multiple separate 480V 3phase feeders in a single conduit? What NEC articles cover this? We're trying to save on materials and labor, so any insight on the rules here would be huge!